The brick castle walls required that we draw the lines first....
then we started painting. 28' of wall is a lot of bricks.
Of course we had to have a sign on each side with the theme on it.
Turrets and a saguaro.
Outside erection begins. The float bed is a 30' fifth-wheel camper frame someone donated to the park. It has signs permanently mounted on the sides with Sunscape written in rope lights.
Of course we had to have a sign on each side with the theme on it.
Turrets and a saguaro.
Outside erection begins. The float bed is a 30' fifth-wheel camper frame someone donated to the park. It has signs permanently mounted on the sides with Sunscape written in rope lights.
The castle starts going up.
This gave us an idea to have a Jack-in-the-Box on the float next season.
The tops of the turrets going on.
Castle completed.
Getting the castle guard walls and the tree ready.
Getting the fringe put on. The bottoms of the palm trees are already wrapped in burlap.
Our trial run through the park. All the fringe is not on yet and the characters aren't lit as well as they will be for the real parades.
The characters at their photo shoot. LOL
The trailer hitched to the truck and ready to go.